Post 6 / Take & Leave / Ledge Installation / 12 X 9 X 9

 Materials: Cardboard Box, Hot Glue

 Necessary Hardware: None

Surface: Ledge of the VAB walls


Steps:

1. Walking into the first floor of the VAB Building, you will walk to the left and see the back wall where there is a ledge

2. On this ledge you will place the box, making sure it is centered

3. Placing a flyer with the instructions to the side (either side is fine as long as there is space for it) where it can be clearly seen

4. Repeat in the exact place on both the Basement floor and 2nd floor


Progress Pics:






No comments:

Post a Comment